IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MDA_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Moldova, 2019
Get Microdata
Reference ID
MDA_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7909
Downloads
145
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • moldova_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: moldova_2019_full_data.dta

Overview

Valid: 28
Invalid: 332
Minimum: -9
Maximum: 130
Type: Discrete
Decimal: 0
Start: 236
End: 238
Width: 3
Range: -9 - 130
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
7.1%
-6 Still in process 1
3.6%
-5 Application denied 0
0%
1 One day or less 6
21.4%
3 3
10.7%
4 1
3.6%
7 1
3.6%
10 3
10.7%
15 3
10.7%
20 1
3.6%
30 2
7.1%
45 1
3.6%
60 1
3.6%
90 2
7.1%
130 1
3.6%
Sysmiss 332
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.