IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MDA_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Moldova, 2019
Get Microdata
Reference ID
MDA_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7984
Downloads
145
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • moldova_2019_full_data.dta

How Often Does The Top Manager Meet With Suppliers? (BMt2)

Data file: moldova_2019_full_data.dta

Overview

Valid: 125
Invalid: 235
Minimum: -9
Maximum: 5
Type: Discrete
Decimal: 0
Start: 1503
End: 1504
Width: 2
Range: -9 - 5
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 17
Literal question
In a typical week, how often does the top manager meet with suppliers?
Categories
Value Category Cases
-9 Don't know (spontaneous) 10
8%
1 Never 26
20.8%
2 Once a week 57
45.6%
3 Between 2 and 4 times a week 20
16%
4 Daily 10
8%
5 More than once a day 2
1.6%
Sysmiss 235
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.