IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TJK_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Tajikistan, 2019
Get Microdata
Reference ID
TJK_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7282
Downloads
117
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • tajikistan_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: tajikistan_2019_full_data.dta

Overview

Valid: 20
Invalid: 332
Minimum: -9
Maximum: 360
Type: Discrete
Decimal: 0
Start: 195
End: 197
Width: 3
Range: -9 - 360
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 3
15%
-6 Still in process 2
10%
-5 Application denied 0
0%
1 One day or less 4
20%
2 2
10%
3 3
15%
6 1
5%
7 2
10%
15 1
5%
20 1
5%
360 1
5%
Sysmiss 332
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.