IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Uzbekistan, 2019
Get Microdata
Reference ID
UZB_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7626
Downloads
96
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • uzbekistan_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: uzbekistan_2019_full_data.dta

Overview

Valid: 127
Invalid: 1112
Minimum: -9
Maximum: 700
Type: Discrete
Decimal: 0
Start: 307
End: 309
Width: 3
Range: -9 - 700
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
3.9%
-6 Still in process 6
4.7%
-5 Application denied 4
3.1%
1 One day or less 36
28.3%
2 8
6.3%
3 12
9.4%
4 3
2.4%
5 7
5.5%
6 2
1.6%
7 14
11%
10 15
11.8%
15 5
3.9%
20 1
0.8%
30 6
4.7%
90 1
0.8%
120 1
0.8%
700 1
0.8%
Sysmiss 1112
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.