IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Uzbekistan, 2019
Get Microdata
Reference ID
UZB_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7474
Downloads
96
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • uzbekistan_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: uzbekistan_2019_full_data.dta

Overview

Valid: 295
Invalid: 944
Minimum: -9
Maximum: 728
Type: Discrete
Decimal: 0
Start: 1423
End: 1425
Width: 3
Range: -9 - 728
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 29
9.8%
-6 Still in process 38
12.9%
-5 Application denied 18
6.1%
1 One day or less 27
9.2%
2 5
1.7%
3 22
7.5%
4 3
1%
5 6
2%
7 26
8.8%
8 1
0.3%
9 1
0.3%
10 26
8.8%
12 2
0.7%
14 2
0.7%
15 9
3.1%
20 6
2%
24 1
0.3%
30 33
11.2%
40 2
0.7%
45 2
0.7%
50 1
0.3%
60 9
3.1%
90 4
1.4%
120 1
0.3%
150 1
0.3%
175 1
0.3%
180 4
1.4%
200 2
0.7%
240 1
0.3%
280 1
0.3%
300 1
0.3%
360 1
0.3%
365 5
1.7%
450 1
0.3%
500 1
0.3%
655 1
0.3%
728 1
0.3%
Sysmiss 944
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.