IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Uzbekistan, 2019
Get Microdata
Reference ID
UZB_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7494
Downloads
96
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • uzbekistan_2019_full_data.dta

Informal Gift/Payment Expected or Requested For A Construction-Related Permit (g4)

Data file: uzbekistan_2019_full_data.dta

Overview

Valid: 295
Invalid: 944
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 1426
End: 1427
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 13
4.4%
-8 Refusal (spontaneous) 3
1%
1 Yes 8
2.7%
2 No 271
91.9%
Sysmiss 944
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.