IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Uzbekistan, 2019
Get Microdata
Reference ID
UZB_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7749
Downloads
96
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • uzbekistan_2019_full_data.dta

Over Last 3 Years, Was Max. Payback Time vs. Non-Energy Efficiency Measures (BMGc29)

Data file: uzbekistan_2019_full_data.dta

Overview

Valid: 113
Invalid: 1126
Minimum: -9
Maximum: 3
Type: Discrete
Decimal: 0
Start: 2460
End: 2461
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Categories
Value Category Cases
-9 Don't Know (Spontaneous) 10
8.8%
1 Longer 26
23%
2 Equal 44
38.9%
3 Shorter 33
29.2%
Sysmiss 1126
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.