IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KAZ_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Kazakhstan, 2019
Get Microdata
Reference ID
KAZ_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8840
Downloads
139
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • kazakhstan_2019_full_data.dta

For The Next 3 Years, Which Public Spending Should Be of Highest Priority? (BMj5)

Data file: kazakhstan_2019_full_data.dta

Overview

Valid: 1446
Invalid: -
Minimum: -9
Maximum: 7
Type: Discrete
Decimal: 0
Start: 2065
End: 2066
Width: 2
Range: -9 - 7
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 31
Literal question
From the perspective of this establishment, for the next three years, which one of the following areas of public spending should be the highest priority?
Categories
Value Category Cases
-9 Don't know (spontaneous) 39
2.7%
1 Transport 209
14.5%
2 Energy 150
10.4%
3 Environment 163
11.3%
4 Education 293
20.3%
5 Health 407
28.1%
6 Information and Communication Technology 142
9.8%
7 Other (spontaneous-specify) 43
3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.