IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KAZ_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Kazakhstan, 2019
Get Microdata
Reference ID
KAZ_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8759
Downloads
139
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • kazakhstan_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: kazakhstan_2019_full_data.dta

Overview

Valid: 123
Invalid: 1323
Minimum: -9
Maximum: 120
Type: Discrete
Decimal: 0
Start: 273
End: 275
Width: 3
Range: -9 - 120
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 13
10.6%
-6 Still in process 4
3.3%
-5 Application denied 0
0%
1 One day or less 19
15.4%
2 6
4.9%
3 12
9.8%
5 8
6.5%
6 1
0.8%
7 10
8.1%
8 1
0.8%
10 7
5.7%
12 2
1.6%
13 1
0.8%
14 10
8.1%
15 5
4.1%
20 4
3.3%
30 10
8.1%
35 2
1.6%
60 4
3.3%
90 2
1.6%
100 1
0.8%
120 1
0.8%
Sysmiss 1323
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.