IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_MES_V01_M / variable [F1]
central

Micro-Enterprise Survey 2019

Georgia, 2019
Get Microdata
Reference ID
GEO_2019_MES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5277
Downloads
120
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_micro_2019_full_data.dta

Total Cost of Electricity In Last Completed Month (n2b1)

Data file: georgia_micro_2019_full_data.dta

Overview

Valid: 11
Invalid: 109
Minimum: -9
Maximum: 100
Type: Discrete
Decimal: 0
Start: 1212
End: 1214
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In [Insert last completed month], what was the total cost of electricity of this establishment?
- Total cost of electricity in the last completed month
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
18.2%
0 1
9.1%
10 2
18.2%
20 1
9.1%
23 1
9.1%
30 2
18.2%
42 1
9.1%
100 1
9.1%
Sysmiss 109
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.