IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / POL_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Poland, 2018 - 2019
Get Microdata
Reference ID
POL_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7757
Downloads
128
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • poland_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: poland_2019_full_data.dta

Overview

Valid: 84
Invalid: 1285
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 1670
End: 1672
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 18
21.4%
-6 Still in process 11
13.1%
-5 Application denied 2
2.4%
1 One day or less 5
6%
7 1
1.2%
10 1
1.2%
14 1
1.2%
18 1
1.2%
20 3
3.6%
30 18
21.4%
45 1
1.2%
50 2
2.4%
60 4
4.8%
65 1
1.2%
75 1
1.2%
90 5
6%
120 2
2.4%
180 7
8.3%
Sysmiss 1285
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.