IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / POL_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Poland, 2018 - 2019
Get Microdata
Reference ID
POL_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7814
Downloads
128
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • poland_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: poland_2019_full_data.dta

Overview

Valid: 32
Invalid: 1337
Minimum: -9
Maximum: 250
Type: Discrete
Decimal: 0
Start: 272
End: 274
Width: 3
Range: -9 - 250
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
15.6%
-6 Still in process 10
31.3%
-5 Application denied 1
3.1%
1 One day or less 2
6.3%
3 1
3.1%
4 2
6.3%
10 1
3.1%
14 1
3.1%
30 3
9.4%
60 2
6.3%
90 3
9.4%
250 1
3.1%
Sysmiss 1337
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.