IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Slovenia, 2018 - 2019
Get Microdata
Reference ID
SVN_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8164
Downloads
118
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • slovenia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: slovenia_2019_full_data.dta

Overview

Valid: 106
Invalid: 303
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 1739
End: 1741
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 12
11.3%
-6 Still in process 30
28.3%
-5 Application denied 2
1.9%
1 One day or less 2
1.9%
2 1
0.9%
3 1
0.9%
6 1
0.9%
7 2
1.9%
14 3
2.8%
25 1
0.9%
30 5
4.7%
45 1
0.9%
50 1
0.9%
58 1
0.9%
60 10
9.4%
90 12
11.3%
120 2
1.9%
150 1
0.9%
160 1
0.9%
180 8
7.5%
300 1
0.9%
365 3
2.8%
500 1
0.9%
720 2
1.9%
730 2
1.9%
Sysmiss 303
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.