IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SVN_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Slovenia, 2018 - 2019
Get Microdata
Reference ID
SVN_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8040
Downloads
118
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • slovenia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: slovenia_2019_full_data.dta

Overview

Valid: 26
Invalid: 383
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 402
End: 404
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
19.2%
-6 Still in process 7
26.9%
-5 Application denied 0
0%
1 One day or less 2
7.7%
3 1
3.8%
5 1
3.8%
7 1
3.8%
14 4
15.4%
30 3
11.5%
90 1
3.8%
365 1
3.8%
Sysmiss 383
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.