IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UKR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Ukraine, 2019
Get Microdata
Reference ID
UKR_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7438
Downloads
128
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ukraine_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: ukraine_2019_full_data.dta

Overview

Valid: 163
Invalid: 1174
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 1761
End: 1763
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 18
11%
-6 Still in process 33
20.2%
-5 Application denied 8
4.9%
1 One day or less 8
4.9%
2 5
3.1%
3 2
1.2%
4 2
1.2%
5 6
3.7%
6 3
1.8%
8 3
1.8%
9 1
0.6%
10 2
1.2%
11 2
1.2%
12 2
1.2%
14 4
2.5%
15 3
1.8%
16 1
0.6%
20 6
3.7%
21 1
0.6%
22 1
0.6%
25 2
1.2%
30 18
11%
31 1
0.6%
38 1
0.6%
40 1
0.6%
45 1
0.6%
50 1
0.6%
60 8
4.9%
75 2
1.2%
90 6
3.7%
180 6
3.7%
300 1
0.6%
365 3
1.8%
730 1
0.6%
Sysmiss 1174
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.