IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UKR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Ukraine, 2019
Get Microdata
Reference ID
UKR_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7244
Downloads
128
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ukraine_2019_full_data.dta

How Much of An Obstacle: Corruption (j30f)

Data file: ukraine_2019_full_data.dta

Overview

Valid: 1337
Invalid: -
Minimum: -9
Maximum: 4
Type: Discrete
Decimal: 0
Start: 2112
End: 2113
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 30
Literal question
Using the response options on the card; To what degree are each of the following an obstacle to the current operations of this establishment?
- Corruption
Categories
Value Category Cases
-9 Don't know (spontaneous) 41
3.1%
-7 Does not apply 28
2.1%
0 No obstacle 129
9.6%
1 Minor obstacle 193
14.4%
2 Moderate obstacle 289
21.6%
3 Major obstacle 308
23%
4 Very severe obstacle 349
26.1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
READ OUT OPTIONS

ROTATION POSITIONS VARY AS THE LIST OF OPTIONS IS RANDOMIZED
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.