IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UKR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Ukraine, 2019
Get Microdata
Reference ID
UKR_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7458
Downloads
128
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ukraine_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: ukraine_2019_full_data.dta

Overview

Valid: 63
Invalid: 1274
Minimum: -9
Maximum: 540
Type: Discrete
Decimal: 0
Start: 304
End: 306
Width: 3
Range: -9 - 540
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
1.6%
-6 Still in process 4
6.3%
-5 Application denied 1
1.6%
1 One day or less 15
23.8%
2 5
7.9%
3 2
3.2%
5 4
6.3%
7 4
6.3%
10 4
6.3%
14 3
4.8%
15 1
1.6%
20 2
3.2%
22 1
1.6%
30 6
9.5%
40 1
1.6%
45 2
3.2%
60 2
3.2%
80 1
1.6%
150 1
1.6%
180 2
3.2%
540 1
1.6%
Sysmiss 1274
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.