IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

North Macedonia, 2018 - 2019
Get Microdata
Reference ID
MKD_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8102
Downloads
127
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • north_macedonia_2019_full_data.dta

Did You Experience Insufficient Water Supply For Production In Last FY? (c15)

Data file: north_macedonia_2019_full_data.dta

Overview

Valid: 133
Invalid: 227
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 285
End: 286
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 Don't know (spontaneous) 10
7.5%
-7 The establishment does not use water for production 4
3%
1 Yes 16
12%
2 No 103
77.4%
Sysmiss 227
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
No --> GO TO C.22b
The establishment does not use water for production --> GO TO C.22b
DON’T KNOW (SPONTANEOUS) --> GO TO C.22b
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.