IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

North Macedonia, 2018 - 2019
Get Microdata
Reference ID
MKD_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8043
Downloads
127
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • north_macedonia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: north_macedonia_2019_full_data.dta

Overview

Valid: 80
Invalid: 280
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 1626
End: 1628
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 4
5%
-6 Still in process 20
25%
-5 Application denied 4
5%
1 One day or less 7
8.8%
2 1
1.3%
4 1
1.3%
5 1
1.3%
10 1
1.3%
12 1
1.3%
14 1
1.3%
15 3
3.8%
20 2
2.5%
30 10
12.5%
37 1
1.3%
40 1
1.3%
60 2
2.5%
70 1
1.3%
90 4
5%
100 2
2.5%
150 2
2.5%
180 1
1.3%
200 1
1.3%
250 1
1.3%
300 2
2.5%
365 3
3.8%
400 1
1.3%
700 1
1.3%
730 1
1.3%
Sysmiss 280
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.