IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / JOR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Jordan, 2019
Get Microdata
Reference ID
JOR_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8798
Downloads
176
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • jordan_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: jordan_2019_full_data.dta

Overview

Valid: 83
Invalid: 518
Minimum: -9
Maximum: 100
Type: Discrete
Decimal: 0
Start: 219
End: 221
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
1.2%
-6 Still in process 2
2.4%
-5 Application denied 0
0%
1 One day or less 7
8.4%
2 10
12%
3 8
9.6%
4 25
30.1%
5 13
15.7%
6 11
13.3%
7 2
2.4%
10 1
1.2%
14 1
1.2%
30 1
1.2%
100 1
1.2%
Sysmiss 518
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.