IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5584
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

Application To Obtain An Electrical Connection Submitted Over The Last 2 Years (c3)

Data file: georgia_2019_full_data.dta

Overview

Valid: 581
Invalid: -
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 161
End: 162
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Question pretext
Now, we turn to the establishment’s operations
Literal question
Over the last two years, did this establishment submit an application to obtain an electrical connection?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.2%
1 Yes 123
21.2%
2 No 457
78.7%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
No --> GO TO C.6
DON’T KNOW (SPONTANEOUS) --> GO TO C.6
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.