IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5596
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: georgia_2019_full_data.dta

Overview

Valid: 81
Invalid: 500
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 193
End: 195
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 14
17.3%
-6 Still in process 3
3.7%
-5 Application denied 4
4.9%
1 One day or less 9
11.1%
2 2
2.5%
3 2
2.5%
5 1
1.2%
7 11
13.6%
10 6
7.4%
14 3
3.7%
15 2
2.5%
30 13
16%
45 2
2.5%
60 4
4.9%
90 3
3.7%
150 1
1.2%
180 1
1.2%
Sysmiss 500
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.