IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5622
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

Average Length of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: georgia_2019_full_data.dta

Overview

Valid: 18
Invalid: 563
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 202
End: 204
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
5.6%
1 One hour or less 6
33.3%
2 1
5.6%
3 1
5.6%
5 4
22.2%
6 1
5.6%
8 1
5.6%
13 1
5.6%
24 1
5.6%
180 1
5.6%
Sysmiss 563
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.