IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5608
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

How Much of An Obstacle: Electricity To Operations of This Establishment? (c30a)

Data file: georgia_2019_full_data.dta

Overview

Valid: 581
Invalid: -
Minimum: 0
Maximum: 4
Type: Discrete
Decimal: 0
Start: 207
End: 208
Width: 2
Range: 0 - 4
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 5
Literal question
Using the response options on the card; To what degree is Electricity an obstacle to the current operations of this establishment?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-7 Does not apply 0
0%
0 No obstacle 180
31%
1 Minor obstacle 81
13.9%
2 Moderate obstacle 52
9%
3 Major obstacle 139
23.9%
4 Very severe obstacle 129
22.2%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
SHOW CARD 3
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.