IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5560
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

How Many Meetings With Top Manager Last Longer Than One Hour? (BMt5)

Data file: georgia_2019_full_data.dta

Overview

Valid: 145
Invalid: 436
Minimum: -9
Maximum: 3
Type: Discrete
Decimal: 0
Start: 1282
End: 1283
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 18
Literal question
In a typical week, how many meetings that involve the top manager last longer than one hour?
Categories
Value Category Cases
-9 Don't know (spontaneous) 15
10.3%
1 Fewer than 5 meetings 109
75.2%
2 Between 5 and 10 meetings 18
12.4%
3 Between 11 and 15 meetings 3
2.1%
4 Between 16 and 20 meetings 0
0%
5 More than 20 meetings 0
0%
Sysmiss 436
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.