IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5559
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: georgia_2019_full_data.dta

Overview

Valid: 133
Invalid: 448
Minimum: -9
Maximum: 600
Type: Discrete
Decimal: 0
Start: 1304
End: 1306
Width: 3
Range: -9 - 600
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 21
15.8%
-6 Still in process 13
9.8%
-5 Application denied 8
6%
1 One day or less 8
6%
5 7
5.3%
7 4
3%
10 5
3.8%
12 1
0.8%
14 2
1.5%
15 4
3%
20 4
3%
25 1
0.8%
30 21
15.8%
40 2
1.5%
50 1
0.8%
60 8
6%
70 1
0.8%
90 5
3.8%
100 1
0.8%
120 2
1.5%
180 7
5.3%
200 2
1.5%
250 1
0.8%
350 1
0.8%
365 2
1.5%
600 1
0.8%
Sysmiss 448
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.