IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GEO_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Georgia, 2019 - 2020
Get Microdata
Reference ID
GEO_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5866
Downloads
129
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • georgia_2019_full_data.dta

Over Last 3 Years, Adopt Upgrades of Vehicles, Vessels, Aircraft In The Fleet (BMGc23h)

Data file: georgia_2019_full_data.dta

Overview

Valid: 581
Invalid: -
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 2133
End: 2134
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 39
Literal question
Over the last three years, did this establishment adopt any of the following measures?
- Upgrades of vehicles
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
0.3%
-7 Does not apply (spontaneous) 62
10.7%
1 Yes 216
37.2%
2 No 301
51.8%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
READ OUT IF OVER THE PHONE
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.