IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KSV_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Kosovo, 2018 - 2019
Get Microdata
Reference ID
KSV_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7696
Downloads
168
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • kosovo_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: kosovo_2019_full_data.dta

Overview

Valid: 36
Invalid: 235
Minimum: -9
Maximum: 180
Type: Discrete
Decimal: 0
Start: 1224
End: 1226
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 7
19.4%
-6 Still in process 9
25%
-5 Application denied 1
2.8%
1 One day or less 3
8.3%
4 1
2.8%
10 1
2.8%
14 2
5.6%
15 2
5.6%
30 3
8.3%
90 4
11.1%
120 1
2.8%
180 2
5.6%
Sysmiss 235
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.