IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7436
Downloads
178
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: morocco_2019_full_data.dta

Overview

Valid: 146
Invalid: 950
Minimum: -9
Maximum: 150
Type: Discrete
Decimal: 0
Start: 1118
End: 1120
Width: 3
Range: -9 - 150
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 64
43.8%
-6 Still in process 6
4.1%
-5 Application denied 19
13%
1 One day or less 11
7.5%
2 5
3.4%
3 8
5.5%
5 5
3.4%
6 1
0.7%
7 1
0.7%
8 1
0.7%
10 5
3.4%
11 1
0.7%
12 3
2.1%
15 4
2.7%
20 2
1.4%
30 6
4.1%
45 2
1.4%
60 1
0.7%
150 1
0.7%
Sysmiss 950
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.