IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7823
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Is Environment/CC Manager Evaluated On Meeting Environmental Targets? (BMGc22)

Data file: morocco_2019_full_data.dta

Overview

Valid: 65
Invalid: 1031
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 1837
End: 1838
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
BMGC.22 Is the manager responsible for environmental and climate change issues evaluated against how well the establishment performs on energy consumption, CO2 emissions or other pollution or environmental targets?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
3.1%
1 Yes 44
67.7%
2 No 19
29.2%
Sysmiss 1031
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.