IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7794
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Over Last 3 Years, Max. Time Period for Return On Investment Of The Measures? (BMGc28)

Data file: morocco_2019_full_data.dta

Overview

Valid: 178
Invalid: 918
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 1868
End: 1869
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
BMGC.28 Over the last three years, was there a maximum time period for the return on investment of the adopted energy efficiency measures?
Categories
Value Category Cases
-9 Don't know (spontaneous) 10
5.6%
1 Yes 84
47.2%
2 No 84
47.2%
Sysmiss 918
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
If 2 or -9, GO TO BMGD.6
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.