IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7735
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Has the supply of land adapted to the needs of this establishment? (CNg2)

Data file: morocco_2019_full_data.dta

Overview

Valid: 1096
Invalid: -
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 1978
End: 1979
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
CNG.2 Est-ce que l’offre du foncier est adaptée aux besoins de cet établissement ?
Categories
Value Category Cases
-9 Don't know (spontaneous) 99
9%
1 Yes 333
30.4%
2 No 664
60.6%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
If 1 or -9, ALLEZ À CNG.4
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.