IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7766
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Review by the courts (CNj3b)

Data file: morocco_2019_full_data.dta

Overview

Valid: 165
Invalid: 931
Minimum: -9
Maximum: 4
Type: Discrete
Decimal: 0
Start: 2012
End: 2013
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Literal question
CNJ.3 En utilisant les options de réponses suivantes, à quel point chacune des suivantes quatre phases liées aux procédures judiciaires est un obstacle aux activités actuelles de cet établissement?
- Examen par les tribunaux
Categories
Value Category Cases
-9 Don't know (spontaneous) 29
17.6%
-7 NE S'APPLIQUE PAS (SPONTANEOUS) 11
6.7%
0 Not an obstacle 22
13.3%
1 Minor obstacle 29
17.6%
2 Moderate obstacle 40
24.2%
3 Major obstacle 31
18.8%
4 A very serious obstacle 3
1.8%
Sysmiss 931
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.