IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7737
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Biggest obstacles (CNm2a)

Data file: morocco_2019_full_data.dta

Overview

Valid: 1096
Invalid: -
Minimum: -9
Maximum: 13
Type: Discrete
Decimal: 0
Start: 2068
End: 2069
Width: 2
Range: -9 - 13
Format: Numeric

Questions and instructions

Literal question
CNM.2 En regardant la carte [INSERER LE NUMERO DE LA CARTE] prière de choisir les trois procédures qui représentent les plus grands obstacles aux activités actuelles de cet établissement
- Plus grands obstacles
Categories
Value Category Cases
-9 DON'T KNOW (SPONTANEOUS) 151
13.8%
-7 DOES NOT APPLY (SPONTANEOUS) 162
14.8%
1 Building permits 40
3.6%
2 Access to electricity 35
3.2%
3 Access to water 15
1.4%
4 Access to telecommunications 24
2.2%
5 Transfer of ownership 45
4.1%
6 Declaration and payment of taxes 167
15.2%
7 Refund of VAT credits 42
3.8%
8 Declaration of salaries to the CNSS 57
5.2%
9 Import procedures 36
3.3%
10 Export procedures 59
5.4%
11 Access to land 120
10.9%
12 Access to industrial zones 63
5.7%
13 Exploitation of commercial authorization 80
7.3%
14 Obtaining the main form of collateral 0
0%
15 Qualification, classification, and approval of BET 0
0%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.