IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7699
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Second procedure (CNm1b)

Data file: morocco_2019_full_data.dta

Overview

Valid: 755
Invalid: 341
Minimum: -9
Maximum: 13
Type: Discrete
Decimal: 0
Start: 2088
End: 2089
Width: 2
Range: -9 - 13
Format: Numeric

Questions and instructions

Literal question
CNM.1 En regardant la même carte [INSERER LE NUMERO DE LA CARTE] prière de choisir les trois procédures qui, à votre avis, nécessitent la création de guichets uniques physiques et/ou dématérialisés
- Deuxième procédure
Categories
Value Category Cases
-9 DON'T KNOW (SPONTANEOUS) 51
6.8%
-7 DOES NOT APPLY (SPONTANEOUS) 30
4%
1 Building permits 43
5.7%
2 Access to electricity 28
3.7%
3 Access to water 14
1.9%
4 Access to telecommunications 22
2.9%
5 Transfer of ownership 38
5%
6 Declaration and payment of taxes 112
14.8%
7 Refund of VAT credits 52
6.9%
8 Declaration of salaries to the CNSS 69
9.1%
9 Import procedures 45
6%
10 Export procedures 37
4.9%
11 Access to land 75
9.9%
12 Access to industrial zones 59
7.8%
13 Exploitation of commercial authorization 80
10.6%
14 Obtaining the main form of collateral 0
0%
15 Qualification, classification, and approval of BET 0
0%
Sysmiss 341
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.