IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7685
Downloads
181
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

Third procedure (CNm1c)

Data file: morocco_2019_full_data.dta

Overview

Valid: 674
Invalid: 422
Minimum: -9
Maximum: 13
Type: Discrete
Decimal: 0
Start: 2090
End: 2091
Width: 2
Range: -9 - 13
Format: Numeric

Questions and instructions

Literal question
CNM.1 En regardant la même carte [INSERER LE NUMERO DE LA CARTE] prière de choisir les trois procédures qui, à votre avis, nécessitent la création de guichets uniques physiques et/ou dématérialisés
- Deuxième procédure
Categories
Value Category Cases
-9 DON'T KNOW (SPONTANEOUS) 26
3.9%
-7 DOES NOT APPLY (SPONTANEOUS) 22
3.3%
1 Building permits 34
5%
2 Access to electricity 22
3.3%
3 Access to water 19
2.8%
4 Access to telecommunications 36
5.3%
5 Transfer of ownership 42
6.2%
6 Declaration and payment of taxes 63
9.3%
7 Refund of VAT credits 77
11.4%
8 Declaration of salaries to the CNSS 71
10.5%
9 Import procedures 44
6.5%
10 Export procedures 49
7.3%
11 Access to land 59
8.8%
12 Access to industrial zones 49
7.3%
13 Exploitation of commercial authorization 61
9.1%
14 Obtaining the main form of collateral 0
0%
15 Qualification, classification, and approval of BET 0
0%
Sysmiss 422
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.