IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MAR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Morocco, 2019 - 2020
Get Microdata
Reference ID
MAR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7525
Downloads
178
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • morocco_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: morocco_2019_full_data.dta

Overview

Valid: 44
Invalid: 1052
Minimum: -9
Maximum: 45
Type: Discrete
Decimal: 0
Start: 215
End: 216
Width: 2
Range: -9 - 45
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 23
52.3%
-6 Still in process 1
2.3%
-5 Application denied 2
4.5%
1 One day or less 4
9.1%
2 1
2.3%
3 1
2.3%
4 3
6.8%
5 1
2.3%
6 4
9.1%
10 2
4.5%
30 1
2.3%
45 1
2.3%
Sysmiss 1052
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.