IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Rwanda, 2019 - 2020
Get Microdata
Reference ID
RWA_2019_ES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6215
Downloads
127
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • rwanda_2019_full_data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: rwanda_2019_full_data.dta

Overview

Valid: 24
Invalid: 336
Minimum: -6
Maximum: 365
Mean: 38.3333333333333
Standard deviation: 100.829458543349
Type: Discrete
Decimal: 0
Start: 171
End: 173
Width: 3
Range: -6 - 365
Format: Numeric

Questions and instructions

Literal question
C.4 In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 3
12.5%
-5 Application denied 0
0%
1 One day or less 7
29.2%
2 1
4.2%
3 2
8.3%
5 1
4.2%
7 2
8.3%
9 1
4.2%
10 2
8.3%
30 1
4.2%
60 1
4.2%
64 1
4.2%
356 1
4.2%
365 1
4.2%
Sysmiss 336
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.