IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Rwanda, 2019 - 2020
Get Microdata
Reference ID
RWA_2019_ES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6281
Downloads
127
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • rwanda_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: rwanda_2019_full_data.dta

Overview

Valid: 12
Invalid: 348
Minimum: -6
Maximum: 180
Mean: 18.25
Standard deviation: 51.9704898782166
Type: Discrete
Decimal: 0
Start: 200
End: 202
Width: 3
Range: -6 - 180
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 4
33.3%
-5 Application denied 0
0%
1 One day or less 1
8.3%
2 1
8.3%
3 1
8.3%
7 1
8.3%
10 2
16.7%
30 1
8.3%
180 1
8.3%
Sysmiss 348
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.