IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Rwanda, 2019 - 2020
Get Microdata
Reference ID
RWA_2019_ES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6199
Downloads
127
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • rwanda_2019_full_data.dta

Main Logistics-Related Obstacle Faced in its Direct Import and/or Export Operati (RWAd4)

Data file: rwanda_2019_full_data.dta

Overview

Valid: 101
Invalid: 259
Minimum: -9
Maximum: 5
Mean: 3.24752475247525
Standard deviation: 2.42242003209212
Type: Discrete
Decimal: 0
Start: 653
End: 654
Width: 2
Range: -9 - 5
Format: Numeric

Questions and instructions

Literal question
RWAD.4 In fiscal year [Insert last complete fiscal year], what was the main logistics-related obstacle that this establishment faced in its direct import and/or export operations?
Categories
Value Category Cases
-9 Don't know (spontaneous) 3
3%
1 Inefficient customs clearance process 8
7.9%
2 Poor quality of transport infrastructure 6
5.9%
3 Shipping costs 21
20.8%
4 Delays in delivery time 43
42.6%
5 Other 20
19.8%
Sysmiss 259
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.