IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Rwanda, 2019 - 2020
Get Microdata
Reference ID
RWA_2019_ES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
6192
Downloads
127
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • rwanda_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: rwanda_2019_full_data.dta

Overview

Valid: 42
Invalid: 318
Minimum: -6
Maximum: 90
Mean: 14.4285714285714
Standard deviation: 21.0645267146994
Type: Discrete
Decimal: 0
Start: 2366
End: 2367
Width: 2
Range: -6 - 90
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 5
11.9%
-5 Application denied 2
4.8%
1 One day or less 5
11.9%
2 1
2.4%
3 3
7.1%
4 1
2.4%
5 2
4.8%
6 1
2.4%
7 3
7.1%
10 1
2.4%
14 1
2.4%
15 4
9.5%
20 3
7.1%
25 1
2.4%
30 5
11.9%
60 3
7.1%
90 1
2.4%
Sysmiss 318
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.