IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LTU_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Lithuania, 2018 - 2020
Get Microdata
Reference ID
LTU_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
9291
Downloads
188
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lithuania_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: lithuania_2019_full_data.dta

Overview

Valid: 16
Invalid: 342
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 216
End: 218
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
12.5%
-6 Still in process 2
12.5%
-5 Application denied 3
18.8%
1 One day or less 0
0%
7 2
12.5%
12 1
6.3%
17 1
6.3%
20 2
12.5%
21 1
6.3%
30 1
6.3%
365 1
6.3%
Sysmiss 342
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.