IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Bosnia and Herzegovina, 2019
Get Microdata
Reference ID
BIH_2019_ES_v01_M
Producer(s)
World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
9010
Downloads
140
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bosnia_and_herzegovina_2019_full_data

When You Applied For A Water Connection, Was An Informal Gift/Payment Requested? (c14)

Data file: bosnia_and_herzegovina_2019_full_data

Overview

Valid: 48
Invalid: 314
Type: Discrete
Decimal: 0
Start: 226
End: 227
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
C.14 In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
4.2%
-8 Refusal (spontaneous) 0
0%
1 Yes 2
4.2%
2 No 44
91.7%
Sysmiss 314
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.