IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Bosnia and Herzegovina, 2019
Get Microdata
Reference ID
BIH_2019_ES_v01_M
Producer(s)
World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8992
Downloads
140
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bosnia_and_herzegovina_2019_full_data

Did You Experience Insufficient Water Supply For Production In Last FY? (c15)

Data file: bosnia_and_herzegovina_2019_full_data

Overview

Valid: 134
Invalid: 228
Type: Discrete
Decimal: 0
Start: 228
End: 229
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
C.15 Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
3.7%
-7 The establishment does not use water for production 8
6%
1 Yes 4
3%
2 No 117
87.3%
Sysmiss 228
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No, The establishment does not use water for production, or Don't Know GO TO QUESTION C.22b
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.