IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Bosnia and Herzegovina, 2019
Get Microdata
Reference ID
BIH_2019_ES_v01_M
Producer(s)
World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
8944
Downloads
140
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bosnia_and_herzegovina_2019_full_data

How Much of An Obstacle: Electricity To Operations of This Establishment? (c30a)

Data file: bosnia_and_herzegovina_2019_full_data

Overview

Valid: 362
Invalid: 0
Type: Discrete
Decimal: 0
Start: 236
End: 237
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD
Literal question
C.30A Using the response options on the card; To what degree is Electricity an obstacle to the current operations of this establishment?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
0.6%
-7 Does not apply 0
0%
0 No obstacle 183
50.6%
1 Minor obstacle 55
15.2%
2 Moderate obstacle 48
13.3%
3 Major obstacle 33
9.1%
4 Very severe obstacle 41
11.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1)The manager should be given a card with the different alternatives for 'degree of obstacle' (from 0 to 4).
2) Sensitive question, no clarification can be offered.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.