IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Bosnia and Herzegovina, 2019
Get Microdata
Reference ID
BIH_2019_ES_v01_M
Producer(s)
World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
9021
Downloads
140
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bosnia_and_herzegovina_2019_full_data

Other (Specify) (BMj5x)

Data file: bosnia_and_herzegovina_2019_full_data

Overview

Valid: 12
Invalid: 0
Type: Discrete
Start: 1877
End: 1907
Width: 31
Range: -
Format: character

Questions and instructions

Question pretext
Show card 31
Literal question
BMJ.5 From the perspective of this establishment, for the next three years, which one of the following areas of public spending should be the highest priority? - other, specify
Categories
Value Category Cases
Building highways 1
8.3%
Fiscal levies 1
8.3%
Infrastructure 1
8.3%
Investment in economy 1
8.3%
Prevention of work in grey area 1
8.3%
availability of raw materials 1
8.3%
civil engineering 1
8.3%
infrastructure 1
8.3%
labour force 1
8.3%
production 1
8.3%
retail and wholesale 1
8.3%
sales 1
8.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.