IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Bosnia and Herzegovina, 2019
Get Microdata
Reference ID
BIH_2019_ES_v01_M
Producer(s)
World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
9672
Downloads
149
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bosnia_and_herzegovina_2019_full_data

Over Last 3 Years, Max. Time Period for Return On Investment Of The Measures? (BMGc28)

Data file: bosnia_and_herzegovina_2019_full_data

Overview

Valid: 77
Invalid: 285
Type: Discrete
Decimal: 0
Start: 2402
End: 2403
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
BMGC28. Over the last three years, was there a maximum time period for the return on investment of the adopted energy efficiency measures?
Categories
Value Category Cases
-9 Don't know (spontaneous) 10
13%
1 Yes 23
29.9%
2 No 44
57.1%
Sysmiss 285
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
If answer is No or Don't Know go to BMGD6
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.