IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / HTI_2019_ES_V01_M / variable [F3]
central

Enterprise Survey 2019

Haiti, 2019
Get Microdata
Reference ID
HTI_2019_ES_v01_M
Producer(s)
World Bank Group
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5611
Downloads
132
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • haiti_2019_full_data

Informal Gift/Payment Expected or Requested For A Construction-Related Permit (g4)

Data file: haiti_2019_full_data

Overview

Valid: 23
Invalid: 126
Type: Discrete
Decimal: 0
Start: 1428
End: 1429
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
G.4 In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 4
17.4%
-8 Refusal (spontaneous) 0
0%
1 Yes 0
0%
2 No 19
82.6%
Sysmiss 126
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for construction permit. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.