IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BGR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Bulgaria, 2019 - 2020
Get Microdata
Reference ID
BGR_2019_ES_v01_M
Producer(s)
The World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
9138
Downloads
153
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bulgaria_2019_full_data.dta

Over Last 3 Years, Adopt Other Pollution Control Measures (BMGc23j)

Data file: bulgaria_2019_full_data.dta

Overview

Valid: 772
Invalid: -
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 2078
End: 2079
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 39 (READ OUT IF OVER THE PHONE)
Literal question
Over the last three years, did this establishment adopt any of the following measures?
- Other pollution control measures
Categories
Value Category Cases
-9 Don't know (spontaneous) 36
4.7%
-7 Does not apply (spontaneous) 59
7.6%
1 Yes 110
14.2%
2 No 567
73.4%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.