IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BGR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Bulgaria, 2019 - 2020
Get Microdata
Reference ID
BGR_2019_ES_v01_M
Producer(s)
The World Bank Group, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
9190
Downloads
153
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bulgaria_2019_full_data.dta

Over Last 3 Years, Was Max. Payback Time vs. Non-Energy Efficiency Measures (BMGc29)

Data file: bulgaria_2019_full_data.dta

Overview

Valid: 134
Invalid: 638
Minimum: -9
Maximum: 3
Type: Discrete
Decimal: 0
Start: 2122
End: 2123
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Categories
Value Category Cases
-9 Don't Know (Spontaneous) 10
7.5%
1 Longer 29
21.6%
2 Equal 62
46.3%
3 Shorter 33
24.6%
Sysmiss 638
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.